![]() While some aspects of the building were replaced or repaired, many original features remain including the chalkboards, window fixtures, the kid-sized sinks, toilets and drinking fountains, and the shelving and cabinet units. The City of Fallon replaced the roof of each building in previous years as a way to help preserve the historical integrity of the facilities. ![]() The three-man county facilities crew of Gary Rothery, Sean Hessey and Mike Nolan, along with several local contractors, added new flooring, redid the majority of the plumbing, painted the interior, replaced broken windows and got the HVAC and water heater running over the course of the last several months. Renovations to the second of the three Cottage School buildings were completed in time to welcome children for the 2023 SUMFUN program.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |